• Prepared civil/stormwater engineer
• To be consistent with the final architectural plan
• Accordance with the requirements of Clause 2.1 of Council’s adopted stormwater Management Policy(SMP) and AS/NZ 3500.3.2003
• Pursuant and following Clause B.6 and E of Terms and Conditions